Showing posts with label SRM. Show all posts
Showing posts with label SRM. Show all posts

VMWare SRM 8.3 protection group and steps to create a protection group and run recovery

 


What is a protection group and steps to create a protection group and run recovery in SRM 8.3.

SRM protection groups are groups of virtual machines that SRM protects together. It protects VM based on protection type selection i.e individual VM or all VM deployed in specific datastore.  One or more protection groups can be included in a recovery plan.


There are four types of protection group in SRM

Datastore group (Array-based replication) -> Protect all virtual machines which are on specific Datastore.

Individual VMs (vSphere Replication) ->      Protect specific virtual machines, regardless of the Datastore

Virtual Volumes (vVol replication)->         Protect virtual machines which are on replicated vVol storage

Storage policies (array-based replication)-> Protect virtual machines with specific storage policies.



Steps to create a protection group.

Login to vCenter

Click on Menu -> Click shortcuts


Click site recovery 


Click Open site recovery

Click View details

If you have not already paired two sites then first you need to pair PRD and DR sites.



Click on protection Group

Click New


Enter Name

Select direction: In my case I am replicating from prod SRM to DR 


Select replication type.

If you will select Datastore groups, all VMs inside the specific Datastore will be protected 

In my case I am selecting individual VMs


Select the Virtual machine that you want to add in the protection group.

Make sure VM is powered on and VMTool is installed, you can add power off VM in the protected group or replication but replication will not work and when you will run VM recovery it will also fail.


Select recovery plan


Click finish

Now protection group has created


One VM is protected in the PRD_VMs protection group.




When you will run recovery below steps will perform.

Click Run


Select Recovery type and click on I understand that this *****


Click next






Now recovery has completed and VM is powered off at PRD site and Powered ON at DR site.


PRD site


DR Site



VMWare vSphere Site Recovery Manager SRM Network , Folder and Resource Mapping

VMWare vSphere Site Recovery Manager SRM Post Deployment Configuration


When you install site Recovery Manager you have to do Inventory Mappings from DC site to DR sire. Inventory mapping includes network mappings, Folder mappings, Resource mappings, Storage policy mappings. All of the mappings require for proper management and configuration of virtual machine at DR site.


1. Network Mapping -> Network Mappings is very important to provide the Network connectivity to virtual machines. In Network Mapping we specify the network to be mapped from protected site (DC site) to Recovery site (DR Site). So that if you do recovery of the virtual machines, your virtual machines will get access to the network


Steps to configure Network Mapping in SRM 8.3


Login to vCenter server.

Go to site recovery

Click on the new site pair

 

If you have not paired already. In my case I have already paired




Click view details if you have already paired site


Under the configuration click network mapping.



Click new



Select creation mode either automatically or manually.

In my case I am selecting manually

Expand the network vDS and select the NIC in both vCenter that you want to configure for recovery network



Click Add mapping -> Next



Select portgroup that you want for Reverse mapping -> Next



Click change if you want to create an isolated network for specific portgroup or click next for default.



Click next



Click next



Now network mapping is created.


1.      2. Folder Mappings -:  Folder Mappings is nice feature which helps you to organize Virtual Machines in folders. You can Map the folders from Protected Site to the Recovery site so you can make proper management of Virtual Machines. Before starting with Folder Mappings make sure you create same folders at the Recovery Site.


Steps to configure folder mapping in SRM 8.3

Create folder at both PRD and DR sites from vCenter console

Go to Site Recovery console 

Under configuration -> Select Folder mappings

Click new


Select folder mapping mode 



Select folder from list and click add mapping

Click next

Enable reverse mapping

Click next


Click next



Finish

Now folder has mapped visible from both PRD and DR


 

1.    3. Resource Mapping-: Resource mappings allow you to map the resources from protected site to recovery site. You can map resource pools, standalone hosts, vApps or clusters on the protected site to resource pools, standalone hosts, vApps, or clusters on the recovery site. You can map any types of resource on one site to any types of resource on the other site. It is useful when you are using resource pools so that you can map resource to the recovery site for easy management.

     You need to create same resource at both PRD and DR sites.


Go to Site Recovery console 

Under configuration -> Select Resource mappings

Click new


Select resource from the list 



Click add mapping


Enable  reverse mappings -> click next





Click Finish

Now Resource mapping has been created.


Same you need to do for Placeholder Datastore






Featured Post

HPE MSA 2040 configuration step by step

HPE MSA 2040 configuration Default IP range for HP SAN storage MSA 2040 is 10.0.0.1/2 You need to connect your laptop and storage with...